Avino Silver
2016-1-182. Mill availability was down 3 due to the re-lining of the ball mill for Circuit 3. 3. Tonnage processed increased by 3 due to optimization work done on Circuit 3. 4. Silver and gold feed grades increased by 5 and 27 respectively while the copper grade decreased by 6 the variation in grades is due to variability in the resource.